How to win a public tender in Norway: a practical guide for Lithuanian companies
Finding a tender in Norway is not hard. Winning one is harder: the documents are in Norwegian, price is rarely the only criterion, and the buyer checks qualification, working conditions and the subcontracting chain. This guide walks a Lithuanian company through the process, from choosing a tender to the award decision, so that the bid is competitive and is not rejected on a formality.
How to choose the right tenders
A common first-year mistake is bidding on everything that looks similar to your work. A good bid takes weeks to prepare, so set selection rules in advance.
Start with CPV codes and Norwegian keywords for your field. How to search Doffin and which thresholds apply is covered in detail in our guide to public procurement in Norway, so we will not repeat it here. Once you find a tender, ask yourself a few questions:
- Do we have similar references? Norwegian buyers want to see work of similar size and type, ideally with client contacts.
- Does the contract size suit us? A contract that is too large will require turnover and capacity you may not have. One that is too small will not cover the cost of preparation and travel.
- Can we serve the contract locally? Warranty work, maintenance or urgent call-outs in northern Norway cost very different money than in Oslo.
- Is the tender divided into lots? Large tenders are often split into regional lots or trades (delkontrakter). Preparing for one lot is more realistic.
It also helps to look at the same buyer's earlier tenders. In contract award notices you can see who won, how many bids were received and sometimes the value. If the buyer purchases the same thing every year and the same local company always wins, your first bid will have to be very strong.
The notice and the tender documents
The Doffin notice is only a summary. All the procurement documents sit in the tender management system chosen by the buyer (KGV), most often Mercell or EU-Supply. Register there as soon as you decide to consider the tender seriously and mark your interest. Only then will you receive notifications about changes.
The document set usually has several parts:
- Tender rules (konkurransegrunnlag or konkurransebestemmelser): procedure, deadlines, qualification requirements, award criteria and their weights.
- Technical specification (kravspesifikasjon): exactly what must be delivered or performed. Requirements are often split into mandatory (minstekrav) and evaluated (evalueringskrav).
- Draft contract: construction contracts often build on Norwegian standards (NS), while services and IT procurements often use the government standard agreements (SSA).
- Price form (prisskjema): fill it in exactly as provided, without changing its structure.
Keep a table of each mandatory requirement, where the bid answers it and who owns it. Failing a mandatory requirement usually means rejection, even if your price is the best. Read the draft contract's penalties, warranty and insurance requirements especially carefully, because they feed straight into the price.
Qualification and the ESPD
Qualification requirements (kvalifikasjonskrav) answer the question of whether the company is capable of performing the contract at all. Buyers usually check registration, financial standing, technical capacity and references, sometimes certificates. In tenders above the EU (EEA) thresholds you first fill in the ESPD, and the buyer asks for evidence only from the supplier it intends to select.
The fact that evidence is requested later does not mean it can be prepared later. The deadline to submit documents after the request is short, and a foreign company needs translations, tax certificates and reference letters. In practice it is worth keeping a ready "qualification folder" in English that you simply update:
- a register extract and company description;
- certificates of paid taxes and social security contributions from the Lithuanian authorities;
- financial statements for recent years;
- 3–5 references with client contacts, scope and dates;
- quality, environmental and occupational safety certificates, if you have them.
Describe references so that the link to the specific tender is obvious: who the client was, the value, the work and the result.
Price and quality: how bids are evaluated
The winner is chosen on the basis of the most economically advantageous tender. That can mean price alone, but in Norway quality, environment, project organisation or delivery time are often evaluated as well. The weights are stated in the tender rules, for example price 50%, quality 30%, environment 20%.
When quality descriptions make up a third or half of the score, a weak description eats up the price advantage. A few tips:
- Answer what is asked. If the criterion is "work organisation and risk management", describe the risks of this particular project and what you will do about them, not a general company presentation.
- Be specific. Names, roles, years of experience, a schedule in weeks. Abstract promises score low.
- Take the environmental criterion seriously. Norwegian buyers often evaluate transport, machine emissions on site or material declarations.
Calculate the price with all Norwegian costs included: wages under the mandatory terms, travel, accommodation, insurance, currency risk and administration. A price that looks abnormally low may draw questions from the buyer, and if the explanation is not convincing, the bid can be rejected.
Clarification questions
You can and should ask the buyer questions. They are submitted through the tender system before the deadline stated in the documents, and the answers are published anonymously to all participants. These become clarifications and form part of the procurement documents.
If the specification contains a requirement that only one manufacturer meets, ask whether an equivalent solution is accepted. If it is unclear whether bids may be submitted in English, ask. If a line is missing from the price form, point it out. Keep questions short and refer to the document name and section.
Follow the answers right up to the deadline. The buyer may change the specification, the price form or even the deadline, and you are responsible for bidding on the latest version.
Local partner, consortium or subcontracting
If your references or turnover are not enough, there are several routes. You can rely on another company's capacity, provided that company commits to making it available. You can submit a joint bid with a partner (a consortium), in which case each member fills in an ESPD and the buyer checks all of them. Or you can skip bidding directly and start with subcontracting for a Norwegian main contractor.
A local partner is useful for more than qualification. They know the buyer, the language and the local labour rules, and can provide service after delivery. Agree in writing beforehand who is responsible for what, how risks are shared and who communicates with the buyer.
For many companies the most realistic first step is subcontracting. How to find the contractors that won and which requirements apply to a subcontractor is covered in a separate article, "Subcontracting in Norway: what a Lithuanian contractor needs to know".
Working conditions requirements from July 2026
On 1 July 2026 new social requirements in the Norwegian Public Procurement Act (lov om offentlige anskaffelser) came into force. When a contract's value is at or above the publication threshold, the buyer must require in construction and service contracts that workers' pay and conditions match a generally applicable or a nationwide industry collective agreement. Construction and cleaning contracts also require occupational pension and HMS cards, and the supplier may have no more than two levels of subcontractors below it (the buyer can allow more if needed for competition and states the maximum in the contract). Some contracts also require part of the work to be done by apprentices (lærlinger).
This means the price must be calculated on Norwegian, not Lithuanian, wages, and the bid may need to show how you will meet these requirements. The exact content is always stated in the specific contract terms.
Language, deadlines and time zone
The tender documents are almost always in Norwegian. The language in which you may submit is stated in the notice and the tender rules. A Scandinavian language is often allowed, sometimes English. If English is not allowed, plan the translation from day one: it is better to write quality descriptions together with a translator who knows your field than to translate in the final week.
Deadlines are given in Norwegian time. Lithuania is one hour ahead, so "kl. 12:00" in Oslo is 13:00 in Vilnius. The tender system will not accept a bid after the deadline, and uploading large files can take time. A practical rule: upload the bid at least a day early and use the last day only to check that everything is in.
Also note the bid validity period. If the decision takes time, the price must remain realistic, so allow for changes in material prices and exchange rates.
After the decision: standstill and KOFA
The buyer notifies all participants of who it intends to award the contract to, with a brief justification: the winner's advantages and how your bid scored on the criteria. The notice starts the standstill period (karensperiode). Its end date is stated in the notice, and the contract cannot be signed before then.
What to do during this time:
- You won: prepare the signing documents, guarantees, insurance and, if needed, registrations in Norway.
- You lost: read the justification and, if it is unclear, ask for an explanation. It is the most valuable lesson for the next tender.
- You believe the evaluation is wrong: first contact the buyer with specific arguments within the standstill period. The buyer can change its decision.
Apart from the courts, disputes can go to KOFA (Klagenemnda for offentlige anskaffelser). Its decisions are advisory, but buyers usually follow them. A complaint to KOFA does not by itself stop the contract from being signed, so when time matters the issue is handled within the standstill period.
How MarketScope helps
MarketScope collects Doffin and TED notices by your CPV codes and keywords, shows contract winners with Brønnøysund register data and links notices about the same object into one project. We do not bid for you: you download the documents from the tender system named in the notice. Book a demo.
Frequently asked questions
Can I submit a bid in English in a Norwegian tender?
Sometimes. The permitted language is stated in the notice and the tender rules. A Scandinavian language is often allowed, sometimes English. If it is unclear, ask the buyer through the tender system.
Where do I find the documents for a Norwegian tender?
The Doffin notice links to the buyer's tender management system, most often Mercell or EU-Supply. You register there, download the documents and submit the bid through it.
Does the cheapest bid win in Norway?
Not always. The most economically advantageous tender wins, and criteria often include quality, environment and organisation. The weights are stated in the tender rules.
What if I disagree with the award decision?
Contact the buyer with specific arguments within the standstill period. The dispute can also go to KOFA, whose decisions are advisory, or to court.
See what your market is doing this week
We will show you monitoring set up for your topics, countries and competitors, with real data.